Commercial Inspections

Permits are not finalized until all required inspections have been conducted and the construction is approved. Building permits are valid and inspections can be made for two years after the permit is issued. Building permits will expire if work does not start within six months of permit issuance or ceases for more than six months. Regular inspections must be requested at each stage of construction prior to concealment or cover.

Process for Building Construction Inspections

The customer requests an inspection by one of the following options:

  • By phone using the Automated Inspection Request System (AIRS) at 602-495-0800. This is a computer-based interactive voice response system. The customer must have a touch-tone phone to use this system. Inspection requests made before 9 p.m. will be scheduled for the next business day.
  • Online using the Online Permitting System. To request an inspection, the customer will enter the key number that is printed on the receipt issued when the permit is purchased.
  • Between 8 a.m. and 5 p.m. customers may call 602-262-7811 to schedule an inspection by speaking with a customer service agent.

A city inspector conducts the inspection based on the approved plans and city codes and ordinances. If the inspection fails, the contractor is notified with a red tag that lists the issue(s) that must be resolved. After resolving the issue, the customer must call for a reinspection. Upon passing inspection, work may continue to the next stage.

All required inspections must be conducted and the construction approved before permanent occupancy will be allowed.

  • The final inspection is conducted when work on the project is completed. This includes all off-site (right-of-way) and on-site (lot) improvements.
  • If the project requires a Certificate of Occupancy (CofO), one will be issued. If not, a green tag will signify compliance.

Codes by inspection Type

102 - Job meeting

114 - Structural demolition

115 - Footing

116 - Stemwall/foundation

117 - Grout/bondbeam

119 - Tilt panels

130 - Framing

133 - Fire stopping

134 - Fire proofing

138 - Deck weld

165 - Drywall/lath

168 - Roofing/re-roofing

175 - Emergency systems

180 - Factory built buildings

198 - Conditional certificate of occupancy

199 - Structural final

202 - Job meeting

214 - Demolition-plumbing/mechanical

230 - On-site utilities

231 - Under-slab plumbing

233 - Top-out/rough plumbing

235 - Gas piping

236 - Backflow prevention

251 - HVAC system

253 - Environmental exhaust

254 - Kitchen exhaust

255 - Hydronic system

280 - Factory built buildings/plumbing

296 - Conditional certificate of occupancy/plumbing

297 - Conditional certificate of occupancy/mechanical

298 - Plumbing final

299 - Mechanical final

302 - Job meeting

314 - Demolition-electrical

315 - Underground electrical

320 - Rough electrical

323 - Service equipment

324 - Switchboards/panel boards

326 - Grounding

328 - Site electrical

350 - Rooftop wiring

375 - Emergency systems

385 - Factory build buildings/electrical

398 - Conditional certificate of occupancy/electrical

399 - Electrical final

402 - Job meeting

410 - Escalator/moving walk

415 - Machine room

420 - Cab

425 - Hoistway/car tops

430 - Pit

498 - Conditional certificate of occupancy/elevator

499 - Elevator final

590 - Civil-final walkthrough

599 - Civil-final/project engineering

821 - Site-plan/DR

897 - Pre-site

898 - Site-conditional certificate of occupancy

899 - Site Final

170 - Fence/enclosure

371 - Pre-gunite

372 - Pre-plaster/final

373 - Pools, spas, and fountains

800 - Miscellaneous sign inspection

814 - Final sign permit

815 - Sign footing

380 - Final sign electrical

381 - Shop inspection (component)